I am now accessing as a :

Government Of Assam Dhubri District

List of Schemes under MPLADS Fund for 4-Dhubri HPC

    1. List of schemes for the year 2014-2015

      Sl. No. Year  Schemes  Name of LAC Caterories 
      SC / ST /
      OTHERS
       Amt.
      Sanction 
        Amt. Released   Balance Amount  Remarks
      1 2014-15
      (Ph - I )
      Const. of Multi - Purpose Hall at Khalishabhita Goalpara Other                15,00,000.00               15,00,000.00                           -   Fund transferred to D.C. Goalpara
      2 2014-15
      (Ph - I )
      Const. of Community Hall at Khudrapoitari Jr. College Goalpara SC                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      3 2014-15
      (Ph - I )
      Const. of 10 Nos. Ring Well within Balijana Block area @ 3 Nos. at Klayanpur GP , 3 Nos. atBaladmari GP , 2 Nos. at Kumri GP & 2 Nos. at Agia GP Goalpara ST                  7,00,000.00                 7,00,000.00                           -   Fund transferred to D.C. Goalpara
      4 2014-15
      (Ph - I )
      Const. of Community Hall at Nolonga near Kanjul Uloom Madrassa Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      5 2014-15
      (Ph - I )
      Const. of Community Hall at Manashpara near M.E. School Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      6 2014-15
      (Ph - I )
      Const. of Hasilabil village road from Kismot house to Noushad house via Salam House Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      7 2014-15
      (Ph - I )
      Const. of Community Hall at Bahati Salmara Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      8 2014-15
      (Ph - I )
      Const. of community hall at the premises of Ghewmari M.E. Madrassa DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      9 2014-15
      (Ph - I )
      Protection measures against erosion by the river Brahamputra at Nichmonirchar Jaleswar Other               20,00,000.00              20,00,000.00                           -   Work Completed
      10 2014-15
      (Ph - I )
      Const. of boundary wall with Land development at Nara Narayana Jr. College DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      11 2014-15
      (Ph - I )
      Const. of road from Newghat, Dilbar Ali house to Mollapara Masjid DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      12 2014-15
      (Ph - I )
      Const. of community hall at Usufia Pre. Sr. Madrassa of Sagalchara DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      13 2014-15
      (Ph - I )
      Const. of Boundary wall of Boalkamri Pt. - I Kabarsthan BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      14 2014-15
      (Ph - I )
      Const. of boundary wall at Andabari Kalairchar Jahanur Islamia Madrassa BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      15 2014-15
      (Ph - I )
      Const. of boundary wall of Kownbari Jhaupara Iddgah BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      16 2014-15
      (Ph - I )
      Const. of Addl. Class Room at Futkibari Hihg School BLP E SC & ST                  5,00,000.00                 5,00,000.00                           -   Work Completed
      17 2014-15
      (Ph - I )
      Const. of RCC building ( Assam Type ) of Jamiyat Model School at Chokapara BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      18 2014-15
      (Ph - I )
      Const. of community hall of Masaneralga Adarsha Samaj Kalyan Samity BLP E SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      19 2014-15
      (Ph - I )
      Const. of boundary wall of Tilapara High School BLP E SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      20 2014-15
      (Ph - I )
      Protection measures against erosion by the river Brahamputra at Sotokolia Pt - II SSM Other               20,00,000.00              20,00,000.00                           -   Work Completed
      21 2014-15
      (Ph - I )
      Const. of community hall at the premises of Satrasal GP Office GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      22 2014-15
      (Ph - I )
      Const. of community hall at Khekshiali Samshanghat Depdhapi G.P GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      23 2014-15
      (Ph - I )
      Protection measures against erosion by the river Brahamputra at Nilokhia Pt - III SSM Other                17,00,000.00               17,00,000.00                           -   Work Completed
      24 2014-15
      (Ph - I )
      Const. of community hall at Majerchar SSM Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      25 2014-15
      (Ph - I )
      Protection measures against erosion by the river Brahamputra at Kokradanga Pt - I MKR Other               40,00,000.00              40,00,000.00                           -   Work Completed
      26 2014-15
      (Ph - I )
      Const. of Market shed at Fulkakata Bazar SSM Other                 6,00,000.00                6,00,000.00                           -   Work Completed
      27 2014-15
      (Ph - I )
      Const. of Addl. Class room at the premises of Mohurirchar High School SSM Other                 2,00,000.00                2,00,000.00                           -   Work Completed
      28 2014-15
      (Ph - I )
      Construction of Boundary Wall at Sindurai Madrassa GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      29 2014-15
      (Ph - I )
      Land development at the premises of Dist. Handicaped Unnayan Suruksha Samity at Balajan Gauripur SC                 2,00,000.00                2,00,000.00                           -   Work Completed
      30 2014-15
      (Ph - I )
      Const. of RCC / Assam Type  community hall at the premises of Rahmatganj Hafizia Madrassa GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      31 2014-15
      (Ph - I )
      Const. of community hall at the premises of Darul Uloom Adabari Pt - I DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      32 2014-15
      (Ph - I )
      Const. of Permanent stage for addressing Public Meeting at Nayeralga High School Playground BLP W Other                10,00,000.00               10,00,000.00                           -   Work Completed
      33 2014-15
      (Ph - II )
      Cost. of B/Wall near Simlabari Anchalik Iddgah under Puthimari GP BLP E Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      34 2014-15
      (Ph - II )
      Impv. of road from Anowar Hussain House towards Niranjan Das House under Anandanagar Bangalipara GP BLP E SC                 3,00,000.00                3,00,000.00                           -   Work Completed
      35 2014-15
      (Ph - II )
      Const. of B/Wall near Alhaj Md. Tayub Ali Iddgah Maidan at Vill. Noonmati Under Geravita GP BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      36 2014-15
      (Ph - II )
      Construction of Community Hall at the premises of Tilapara L.P. School of vill. Khudigaon Pt-II BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      37 2014-15
      (Ph - II )
      Const. of boundary wall with Irongate at Charaikhola near Bidhuti Roy house at Bisondai GP under Golakganj Dev. Block GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      38 2014-15
      (Ph - II )
      Const. of Dormetory Hall at the Premises of Gajarikandi ( Kukurmara PHC ) MKR Other                14,00,000.00               14,00,000.00                           -   Work Completed
      39 2014-15
      (Ph - II )
      Extn. of Community Hall ( RCC2 storied Building ) at the premises of Ahmed ali Hafizia Kharizia Madrassa Medartari GP Jaleswar Other                10,00,000.00               10,00,000.00                           -   Work Completed
      40 2014-15
      (Ph - II )
      Const. of Community Hall at the premises of H.M. High Madrassa Gauripur Other                  2,50,000.00                 2,50,000.00                           -   Work Completed
      41 2014-15
      (Ph - II )
      Extn. of Earth filling of Progressive Unit Halakura GKG SC                 3,00,000.00                3,00,000.00                           -   Work Completed
      42 2014-15
      (Ph - II )
      Impv. of Alomganj Rangamari College Gauripur Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      43 2014-15
      (Ph - II )
      Const. of boundary wall of New Hatipota High School BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      44 2014-15
      (Ph - II )
      Impv. of road from Bamunpara PMGSY road to South Manullapara MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      45 2014-15
      (Ph - II )
      Improvement of Road from Jalauddin house to Mohiron Nessa house of village Sialtari Champaibil, Thakuranbari G.P. MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      46 2014-15
      (Ph - II )
      Protection measures against erosion by the river Kalo at village Kumargati MKR Other                  7,50,000.00                 7,50,000.00                           -   Work Completed
      47 2014-15
      (Ph - II )
      Const. of RCC building at the campus of B.N.College, Dhubri DBB Other            1,00,00,000.00           1,00,00,000.00                           -   Work Completed
      48 2014-15
      (Ph - II )
      Const. of Running Water Supply facilities at Hashdoba Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      49 2014-15
      (Ph - II )
      Const. of Toilet Block at Kaljani near Madrassa Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      50 2014-15
      (Ph - II )
      Const. of Boundary Wall at Kalyanpur Arabic College Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      51 2014-15
      (Ph - II )
      Const. of Class Room of Goalpara Law College ( Ph - II ) Goalpara ST & SC                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      52 2014-15
      (Ph - II )
      Const. of Community Hall at Rajapara under Agia GP Goalpara ST                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      53 2014-15
      (Ph - II )
      Const. of road at Azadnagar with boulder retaining wall of by lane no. 3 of ward no. 19 Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      54 2014-15
      (Ph - II )
      Impv. of Ambari Borbhita road form Ch. 7380 m to Ch. 8100 m. Goalpara Other                10,00,000.00               10,00,000.00                           -   Fund transferred to D.C. Goalpara
      55 2014-15
      (Ph - II )
      Const. of boundary wall of Sakumari Kabarsthan Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      56 2014-15
      (Ph - II )
      Const. of class room of Sakina Khatun Senior madrassa , Nabagata Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      57 2014-15
      (Ph - II )
      Impv. Of Playground of Janaklyan ME School, 2 No. Baladmari char Goalpara Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      58 2014-15
      (Ph - II )
      Const. of toilet block at Shimlabari near madrassa Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      59 2014-15
      (Ph - II )
      Const. of Patient Waiting Shed with toilet at Lakhipur PHC Goalpara SC / ST                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      60 2014-15
      (Ph - II )
      Const. of boundary wall of Mariamnagar Public Field Goalpara ST                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      61 2014-15
      (Ph - II )
      Const. of boundary wall of Gopinath Bordoloi LP School , Fafanga Goalpara SC                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      62 2014-15
      (Ph - II )
      Const. of boundary wall of Nabajyoty Jatiya Vidyalaya , Helpakhri , Ph - I Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
        2014-15
      (Ph - II )
      CONTINGENCY         10,00,000.00    10,00,000.00               -    

      List of schemes for the year 2015-2016

      Sl. No. Year  Schemes  Name of LAC Caterories 
      SC / ST /
      OTHERS
       Amt.
      Sanction 
        Amt. Released   Balance Amount  Remarks
      1 2015-16
      ( 2014-15)
      Int Fund
      Const. of road form Dangujhou to Chaiganda Link Road GKG ST                 3,00,000.00                3,00,000.00                           -   Work Completed
      2 2015-16
      ( 2014-15)
      Int Fund
      Const. of road from Patharchabi Link road to Musuljhora Market with CC Block GKG ST                  5,00,000.00                 5,00,000.00                           -   Work Completed
      3 2015-16
      ( 2014-15)
      Int Fund
      Const. of Road from 31 NH to Hazari Jharna LP School with Sand Gravel GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      4 2015-16
      ( 2014-15)
      Int Fund
      Impv. of road from Monoj Kr. House to Kojobari Bote Rabha house GKG ST                 3,00,000.00                3,00,000.00                           -   Work Completed
      5 2015-16
      ( Ph - I )
      Impv. of Dargha Sharif Buildin at Powa Macca , Hajo ,Dist. Kamrup ( rural ) Assam. Hajo Other                10,00,000.00               10,00,000.00                           -   Work Completed
      6 2015-16
      ( Ph - I )
      Palliative measure to protect of Dhubri Patamari Road cum bundh from the erosion of river Brahmaputra at Jangila DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      7 2015-16
      ( Ph - I )
      Impv. of road from Kalabari Iddgah to Railway Bridge at Falimari Pt - II DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      8 2015-16
      ( Ph - I )
      Const. of Waiting Shad at Jhagrarpar Pt - I near Check Post DBB Other                 8,00,000.00                8,00,000.00                           -   Work Completed
      9 2015-16
      ( Ph - I )
      Impv. of road from Khaibar Ali huse to Railway Gate near Jobed Ali house Gauripur Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      10 2015-16
      ( Ph - I )
      Impv. of road from I.B. Sonkosh Road at 1st K.M. to Anandanagar ( repairing and Back Topping ) BLP E SC                10,00,000.00               10,00,000.00                           -   Work Completed
      11 2015-16
      ( Ph - I )
      Impv. of road from Abdul Barek house to Rojob Ali house at Hatipota Pt - II BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      12 2015-16
      ( Ph - I )
      Impv. of road from Krishna Nager PWD road to Amjad Ali house BLP E SC                 3,00,000.00                3,00,000.00                           -   Work Completed
      13 2015-16
      ( Ph - I )
      Const. of boundary wall at Tilapara Anchalik Kaborsthan BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      14 2015-16
      ( Ph - I )
      Impv. of road from 1107 No. Buchirchar L.P. School to Adom Ali house towards Sagunmari Pt - III BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      15 2015-16
      ( Ph - I )
      Impv. of road from Dhanpur to Suripara BLP W SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      16 2015-16
      ( Ph - I )
      Impv. of road from Monir Uddin house to Surman Ali house at vill. Baniamari Pt - I BLP W Other                 8,00,000.00                8,00,000.00                           -   Work Completed
      17 2015-16
      ( Ph - I )
      Const. of approach road with a Box Culvert at Dalaneralga Pt - I BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      18 2015-16
      ( Ph - I )
      Const. of road with Bolder Pitching at Vill. Geramari Pt - I Gauripur Other                10,00,000.00               10,00,000.00                           -   Work Completed
      19 2015-16
      ( Ph - I )
      Protection and boundary wall at Dalshingeralaga Pt - II Idgah Gauripur Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      20 2015-16
      ( Ph - I )
      Const. of Shed at the premises of Beparipatty Kaborsthan Gauripur Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      21 2015-16
      ( Ph - I )
      Const. of Community Hall at Moterjhar Pre - Senior Madrassa Gauripur Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      22 2015-16
      ( Ph - I )
      Impv. of road from Sabul Hussain house to Border Road via Rustom Ali Sarkar house with Sand gravel at Vill. Lakhimari Pt - II GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      23 2015-16
      ( Ph - I )
      Land development near Char Kumargati Hujurighar of Gaspara GP under Dharmasala Dev. Block  DBB Other                 2,00,000.00                2,00,000.00                           -   Work Completed
      24 2015-16
      ( Ph - I )
      Const. of Sanitation Toilet Block with Ojukhana near Ahmadia Rahmania Darul Quran Hafizia madrassa at Adabari Pt - II of Adabari GP under Dharmasala Dev. Block DBB Other                 2,00,000.00                2,00,000.00                           -   Work Completed
      25 2015-16
      ( Ph - I )
      Const. of Boundary wall of Jannatul Baki Kaborsthan at Kherbari Pt - IV, of Bamundanga GP under Agomani Dev. Block GKG Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      26 2015-16
      ( Ph - I )
      Land Dev. of Naskara Chandipara Kabarsthan  SSM Other                 2,00,000.00                2,00,000.00                           -   Work Completed
      27 2015-16
      ( Ph - I )
      Const. of Class Room of Goalpara Commerce College Goalpara  Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      28 2015-16
      ( Ph - I )
      Const. of boundary wall of Hatishila Kabarsthan Goalpara  Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      29 2015-16
      ( Ph - I )
      Const. of Chain Link Fancing of Chunari College Goalpara  Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      30 2015-16
      ( Ph - I )
      Const. of boundary wall of public field of Rajmita near madrassa Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      31 2015-16
      ( Ph - I )
      Const. of community hall at Jaljalipara under Nabagata Shimlitola Gp Goalpara  Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      32 2015-16
      ( Ph - I )
      Const. of Rupnagar Bi - lane near Khurshid Ali's house Goalpara  Other                 2,00,000.00                2,00,000.00                           -   Fund transferred to D.C. Goalpara
      33 2015-16
      ( Ph - I )
      Const. of boundary wall at Dalgoma Anchalik College Ph - I Goalpara  SC                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      34 2015-16
      ( Ph - I )
      Const. of boundary wall of lakhipur Girl's High School Goalpara  ST / SC                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      35 2015-16
      ( Ph - I )
      Const. of Community hall at Shimlabari near Jum Jum Gym Center Goalpara  Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      36 2015-16
      ( Ph - I )
      Const. of boundary wall at Dekdowa Kabarsthan Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      37 2015-16
      ( Ph - I )
      Const. of road from Ulubari Masjid to Bhalukdubi Ulubari LP School with both side drainage Goalpara  Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      38 2015-16
      ( Ph - I )
      Const. of Boundary Wall of Medhipara Chilarai LP School in lieu of Const. of Waiting Shad at Barmanpara under Dhamar GP Goalpara  SC / ST                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      39 2015-16
      ( Ph - I )
      Const. of boundary wall of Simlabari Kabarsthan ( Majar ) Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      40 2015-16
      ( Ph - I )
      Const. of Class room of Baida College Goalpara  ST                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      41 2015-16
      ( Ph - I )
      Impv. of Rangsapara Village Road in lieu of Const. of community hall at Rowkhowa bollapuri Goalpara  Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      42 2015-16
      ( Ph - I )
      Const. of community hall at Jobdirbhita near orphanage house (Char Model ) Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      43 2015-16
      ( Ph - I )
      Const. of boundary wall of Karbala Public Field Ph - I Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      44 2015-16
      ( Ph - I )
      Const. of community hall at Tarangapur near Madrassa ( Char Model ) Goalpara  Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      45 2015-16
      ( Ph - II )
      Const. of Multi - Purpose Hall at Jaleswar Dev. Block Campus Goalpara  Other                  8,52,000.00                 8,52,000.00                           -   Fund transferred to D.C. Goalpara
      46 2015-16
      ( Ph - II )
      Const. of Class Room of Jawaharlal Neheru M.E. School Goalpara  SC                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      47 2015-16
      ( Ph - II )
      Const. of Class Room of Ahmedia Pre Senior Madrassa , Luptachar Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      48 2015-16
      ( Ph - II )
      Const. of boundary wall with Entry gate of Bapupara Shatra Goalpara  ST / SC                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      49 2015-16
      ( Ph - II )
      Const. of Community Hall at Chakla under Karipara Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      50 2015-16
      ( Ph - II )
      Const. of Staircase at Hurkakuchi river side near Hakikat Ali's house Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      51 2015-16
      ( Ph - II )
      Const. of Boulder Retaining wall at Kharmuza Ujanpara Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      52 2015-16
      ( Ph - II )
      Const. of boundary wall with Field development of Goalpara Girls' High School Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      53 2015-16
      ( Ph - II )
      Const. of boundary wall of Kurshakati M.E. Madrassa Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      54 2015-16
      ( Ph - II )
      Const. of boundary wall of Konasipara LP School Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      55 2015-16
      ( Ph - II )
      Const. of Class Room of Nagorpur LP School Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      56 2015-16
      ( Ph - II )
      Const. of Boundary wall of Dapkarbhita Kabarsthan Goalpara  Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      57 2015-16
      ( Ph - II )
      Const. of Addl. Class Room Saptibari Nasiria Pre Senior Madrassa Goalpara  Other                  5,88,000.00                 5,88,000.00                           -   Fund transferred to D.C. Goalpara
      58 2015-16
      ( Ph - II )
      Const. of Boundary wall of Paschim Saldowa LP School Goalpara  Other                  5,88,000.00                 5,88,000.00                           -   Fund transferred to D.C. Goalpara
      59 2015-16
      ( Ph - II )
      Restoration measure to check the bank erosion by the river Bramaputra at Baladmari Char (Madan Bazar area ) Goaplara District. Goalpara  Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      60 2015-16
      ( Ph - II )
      Cost. of boundary wall of P.B. College Girls Hostel under Gauripur T.C.  Gauripur Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      61 2015-16
      ( Ph - II )
      Const. of boundary wall at Bilasipara Anchalik Iddgah at Bilasipara BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      62 2015-16
      ( Ph - II )
      Const. of road from Halangbazar Baghmari PMGSY road at 1467 No. Kandargaon LP School towards Baghmari Anchalik Iddgah field BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      63 2015-16
      ( Ph - II )
      Impv. of road from Sofior Rahman house towards Kasu Sk house with ICB BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      64 2015-16
      ( Ph - II )
      Const. of Boundary wall at Chirakuta Anchalik Iddgah field BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      65 2015-16
      ( Ph - II )
      Const. of boundary wall of Buchirchar ME Madrassa BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      66 2015-16
      ( Ph - II )
      Const. of boundary wall at Kazaikata People's Multiple Academi HS School BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      67 2015-16
      ( Ph - II )
      Const. of boundary wall at Ghashbari Kabarsthan BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      68 2015-16
      ( Ph - II )
      Const. of boundary wall at Bhatigutipara Kabarsthan at Gutipara Pt. - V BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      69 2015-16
      ( Ph - II )
      Protection cum Land Dev. From Bar Library towards Rajib Gandhi Children Park DBB Other                10,00,000.00               10,00,000.00                           -   Work Completed
      70 2015-16
      ( Ph - II )
      Const. of Community Hall at the premises of Girls' College Dhubri DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      71 2015-16
      ( Ph - II )
      Const. of Road from Uttar Raipur Railwayline to PWD road Gauripur SC                 3,00,000.00                3,00,000.00                           -   Work Completed
      72 2015-16
      ( Ph - II )
      Const. of RCC waiting shed at Molandubi of Kurshakati VCDC Gauripur ST                 3,00,000.00                3,00,000.00                           -   Work Completed
      73 2015-16
      ( Ph - II )
      Const. of RCC waiting shed at Barvita near PWD road of Debitola VCDC Gauripur ST                 3,00,000.00                3,00,000.00                           -   Work Completed
      74 2015-16
      ( Ph - II )
      Const. of RCC Small Culvert near Balajan Bazar to Water supply Gauripur Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      75 2015-16
      ( Ph - II )
      Anti Water logging from Alomganj Bazar Bustand towards Abdus Samad Talukdar house . Gauripur Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      76 2015-16
      ( Ph - II )
      Land Dev. With boundary wall at Ghageralga Idgah Field Gauripur Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      77 2015-16
      ( Ph - II )
      Const. of boundary wall at Simlabari Kabarsthan at Koimari Pt. - I GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      78 2015-16
      ( Ph - II )
      Const. of boundary wall at Kaimari MV School near Baterhat Bazar at Kaimari Pt. - VII GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      79 2015-16
      ( Ph - II )
      Const. of shed ( Janaza Ghar ) of Gokarpar Rajhuwa Kabarsthan at Tolli Pt. - I GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      80 2015-16
      ( Ph - II )
      Const. of Boundary wall of Dham ( Sanyasi ) at Bisondai Pt. - I GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      81 2015-16
      ( Ph - II )
      Const. of raised Platform at Katiaralga Pt. - III ( for shifting BSF Camp ) SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      82 2015-16
      ( Ph - II )
      Const. of C/Hall at the premises of 1 No. Char Bashirchar LP School SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      83 2015-16
      ( Ph - II )
      Const. of Boundary Wall at 9 No. Sand Block Iddgah Field SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      84 2015-16
      ( Ph - II )
      Const. of Community Hall at Ambari Bhuyanpara H.S. School SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      85 2015-16
      ( Ph - II )
      Const. of boundary wall at Mandalpara Kaborsthan MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      86 2015-16
      ( Ph - II )
      Cosnt. of Land Development at Char Shishumara LP School. MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      87 2015-16
      ( Ph - II )
      Land Dev. of Bhurakata M.E. Madrassa field MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      88 2015-16
      ( Ph - II )
      Constn. of Boundary Wall of Telipara Kaborsthan MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      89 2015-16
      ( Ph - II )
      Const. of Boundary wall at Jhowdanga Kaborsthan MKR Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      90 2015-16
      ( Ph - II )
      Land Dev. Of Kakripara State Dispensary field ground MKR Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      91 2015-16
      ( Ph - II )
      Const. of Wooden Bridge approach road at village Kutirghat MKR Other               23,00,000.00              23,00,000.00                           -   Work Completed
      92 2015-16
      ( Ph - II )
      Const. of road from Sekherullah High School ( near habibia Hafizia Madrassa ) towards MB Road via Slab Culvert Ph - I ) DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      93 2015-16
      ( Ph - II )     Int. Fund
      Impv. Of road from Sukanjhar village to Santipur with C.C. block  ( Int. Fund)               GKG Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      94 2015-16
      ( Ph - II )     Int. Fund
      Const. of Road Agril Bundh to Pocharchar LP School  ( Int. Fund) SSM Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      95 2015-16
      ( Ph - II )     Int. Fund
      Const. of road from A. Malek house to Moinuddin house of vill. Howrarpar     ( Int. Fund) DBB Other                 3,80,000.00                3,80,000.00                           -   Work Completed
      96 2015-16
      ( Ph - II )     Int. Fund
      Const. of road from Masem Ali house to Abdullah Sk. House of vill. Kalapakani with Hume pipe                                ( Int. Fund) DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      97 2015-16
      ( Ph - II )     Int. Fund
      Const. of Road from Tojmul Hussain house to Patamari LP School with Small Culvert                     ( Int. Fund) DBB Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      98 2015-16
      ( Ph - I )
      Const. of Shed at Gauripur Vetenary Hospital Gauripur  SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      99 2015-16
      ( Ph - I )
      Const. of Boundary Wall at Sateralga Kabarsthan Gauripur  Other                 2,00,000.00                2,00,000.00                           -   Work Completed
      100 2015-16
      ( Ph - I )
      Const. of Road from Siddik Mandal house to Pocharchar LP School via Mosk at Village Pocharchar Pi.III SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      101 2015-16
      ( Ph - I )
      Const. of Community Hall at Ghagmari  SSM Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      102 2015-16
      ( Ph - I )
      Const. of RCC small Culvert with approach at vill. Chalakura Poyestirchar SSM Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      103 2015-16
      ( Ph - I )
      Impv. Of road from PWD road to Gadadhar River via Rahman Ali house with Sand Gravel and 2 ( two) nos. hume pipe at village lohajani GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      104 2015-16
      ( Ph - I )
      Const. of boundary wall of Kathalbari Kabarsthan at Vill. Pokalagi Pt. III GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      105 2015-16
      ( Ph - I )
      Const. of C/Hall at Jaruarchar Junior College SSM Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      106 2015-16
      ( Ph - I )
      Const. of Boundary wall of 1267 No. Maiserchar LP School at Vill. Kaldoba GKG Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      107 2015-16
      ( Ph - I )
      Inpv. Of road from Shimalkandi to RBP H.S. School Tumni SSM Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      108 2015-16
      ( Ph - II )
      Const. of Addl. Classroom of Dimatala Pt.II ( Tilapara) LP School ( Cord No. 18020305505) SSM Other                  1,00,000.00                 1,00,000.00                           -   Work Completed
      109 2015-16
      ( Ph - II )
      Const. of Addl. Classroom of 1185 No. Nashkara LP School SSM Other                  1,00,000.00                 1,00,000.00                           -   Work Completed
      110 2015-16
      ( Ph - II )
      Const. of Addl. Classroom of Majher Alga LP School ( Cord No. 18020324407) SSM Other                  1,00,000.00                 1,00,000.00                           -   Work Completed
      111 2015-16
      ( Ph - II )
      Const. of Wooden Bridge approach road at village Kutirghat MKR                    5,00,000.00                 5,00,000.00                           -   Work Completed
        2015-16
      ( Ph - II )
      CONTINGENCY         10,00,000.00    10,00,000.00               -    

      List of schemes for the year 2016-2017

      Sl. No. Year  Schemes  Name of LAC Caterories 
      SC / ST /
      OTHERS
       Amt.
      Sanction 
        Amt. Released   Balance Amount  Remarks
      1 2016-17
      ( Ph - I )
      Const. of Boundary Wall at Nayapara High Madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      2 2016-17
      ( Ph - I )
      Const. of Community Hall at  Karbala in lieu of Const. of Community Hall at Madrassa-E-Ayesha Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      3 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Kokira Kabarasthan Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      4 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Sundarpur Kabarsthan Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      5 2016-17
      ( Ph - I )
      Impv. Of Cultural Bhawan at Shayamrai Satra Goalpara SC                 2,94,000.00                2,94,000.00                           -   Fund transferred to D.C. Goalpara
      6 2016-17
      ( Ph - I )
      Const. of Community toilet with water supply facility at Nolonga near madrassa in lieu of Const. of RCC Cannel at Nolonga Majerpara  Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      7 2016-17
      ( Ph - I )
      Const. of Class Room of Chakla ME Madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      8 2016-17
      ( Ph - I )
      Const. of Community Hall near Poitari Bazar Madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      9 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Lakhipur Eidgah Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      10 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Boro Nichinpur Kabarsthan Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      11 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Bhalukmari Tiniali ME Madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      12 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Kaminirbhita LP School Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      13 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Islampur Rajhuwa Kabarsthan under Matia Dev. Block in lieu of Const. of Boundary Wall of Hilful Fajal Banat Khareji Karikori Madrassa, Gugudoba Goalpara Other                 2,94,000.00                2,94,000.00                           -   Fund transferred to D.C. Goalpara
      14 2016-17
      ( Ph - I )
      Const. of Boundary Wall at Hadigaon Kabarsthan Goalpara Other                 2,94,000.00                2,94,000.00                           -   Fund transferred to D.C. Goalpara
      15 2016-17
      ( Ph - I )
      Protection measures against erosion by the river Gangadhar at Vill. Kaldoba Pt-I GKG SC                  5,00,000.00                 5,00,000.00                           -   Work Completed
      16 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Chagolia Balakuti Iddgah Field GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      17 2016-17
      ( Ph - I )
      Const. of Community Hall of Fakhrul Ullum Arabic College ( Title Section ) at Atgharitari GKG Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      18 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Barobari Sr. Madrassa GKG Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      19 2016-17
      ( Ph - I )
      Const. of Shed of Dapurpur Anchalik Kabarsthan GKG Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      20 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Uttar Tokrerchara New Kabarsthan at Vill Uttar Tokrerchara Pt-I GKG Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      21 2016-17
      ( Ph - I )
      Infrastructure Dev. of Samshan Ghat at Araiani Pt-II BLP W SC                 4,00,000.00                4,00,000.00                           -   Work Completed
      22 2016-17
      ( Ph - I )
      Const. of Addl. Class Room at Bantinagar LP School (Char Model) at Noichardhap BLP W Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      23 2016-17
      ( Ph - I )
      Const. of Boundary Wall at Nayeralga Iddgah field near Nayeralga High School. BLP W Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      24 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Boyzeralga Anchalik Kabarsthan at Boyzeralga Pt-III BLP W Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      25 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Pachim Suapata LP School at Suapara Pt-IV BLP W Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      26 2016-17
      ( Ph - I )
      Const. of Culvert with approach at Khudigaon near Soulmari Dong BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      27 2016-17
      ( Ph - I )
      Const. of Boundary wall of Bahalpur Girls' High School BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      28 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Hatipota Kabarsthan BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      29 2016-17
      ( Ph - I )
      Const. of Boundary Wall of 1889 No. Kherdubi LP School BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      30 2016-17
      ( Ph - I )
      Impv. of road from Sultan Ali house towards IB Sankosh road BLP E Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      31 2016-17
      ( Ph - I )
      Impv. of road from Shernagar PMGSY road to Tayab Ali house GKG Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      32 2016-17
      ( Ph - I )
      Const. of RCC Waiting Shed at Dumardaha Pt-II Gauripur Other                 3,00,000.00                 2,25,000.00            75,000.00 On Going
      33 2016-17
      ( Ph - I )
      Const. of RCC Culvert at Sateralga Boraibari GP Gauripur Other                 6,00,000.00                 4,50,000.00         1,50,000.00 On Going
      34 2016-17
      ( Ph - I )
      Const. of RCC Culvert at Chapghar Pt-II near Matikuti Bil Gauripur Other                  5,00,000.00                 3,75,000.00         1,25,000.00 On Going
      35 2016-17
      ( Ph - I )
      Const. of RCC Culvert at Thuriapahar Gauripur ST                 3,00,000.00                 2,25,000.00            75,000.00 On Going
      36 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Balajan Kabarsthan Gauripur Other                 3,00,000.00                 2,25,000.00            75,000.00 On Going
      37 2016-17
      ( Ph - I )
      Const. of Wooden Bridge near Gaon-Jhala at Falimari Pt-II DBB Other                 6,00,000.00                6,00,000.00                           -   Work Completed
      38 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Old Iddgah field (Chattan) at Madhusoulmari Pt-I DBB Other                  2,50,000.00                 2,50,000.00                           -   Work Completed
      39 2016-17
      ( Ph - I )
      Const. of Community Hall at the premises of Habibia Hafizia Madrassa near Shekherullah High School DBB Other                  2,50,000.00                  1,87,500.00            62,500.00 On Going
      40 2016-17
      ( Ph - I )
      Const. of Market Shed at Patamari Bazar DBB Other                  2,50,000.00                  1,87,500.00            62,500.00 On Going
      41 2016-17
      ( Ph - I )
      Const. of Boundary Wall of Dharmasala Kabarsthan DBB Other                  2,53,000.00                 2,53,000.00                           -   Work Completed
      42 2016-17
      ( Ph - I )
      Cosnt. Of Additional Class room at the premises of Gaspara High School at Kumarghati DBB Other                 3,00,000.00                3,00,000.00                           -   Work Completed
      43 2016-17
      ( Ph - I )
      Const. of Toilet Block of College road near West Naya Masque DBB Other                   1,50,000.00                   1,12,500.00            37,500.00 On Going
      44 2016-17
      ( Ph - I )
      Protection work by bouldar Sausage at Vill Kazaikata Pt-V near Kazaikata Madrassa by the river Gourang. (Ph-I) BLP W Other                10,00,000.00               10,00,000.00                           -   Work Completed
      45 2016-17
      ( Ph - I )
      Protection work by bouldar Sausage at Vill Kazaikata Pt-V near Kazaikata Madrassa by the river Gourang. ( Ph-II) BLP W Other                10,00,000.00                 7,50,000.00        2,50,000.00 On Going
      46 2016-17
      ( Ph - I )
      Protection work by bouldar Sausage at Vill Kazaikata Pt-V near Kazaikata Madrassa by the river Gourang. (Ph-III) BLP W Other                  5,00,000.00                 3,75,000.00         1,25,000.00 On Going
      47 2016-17
      ( Ph - I )
      Impv. of approach road at Vill. Dalaneralga Pt-I BLP W Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      48 2016-17
      ( Ph - I )
      Protection measures against erosion by the rvier Brahmaputra at Vill. Boali Pt-I SSM Other                  7,50,000.00                 7,50,000.00                           -   Work Completed
      49 2016-17
      ( Ph - I )
      Const. of B/Wall near South College Nagar Jame Masjid              (Ph-I ) DBB Other                  2,50,000.00                  1,87,500.00            62,500.00 On Going
      50 2016-17
      ( Ph - I )
      Int Fund
      Impv. of road from Ambari Bhuyapara Chariali towards Josim Uddin House  SSM Other                 2,40,000.00                 1,80,000.00           60,000.00 On Going
      51 2016-17
      ( Ph - I )
      Const. of C/Hall near the Madrassa of Ishayatu Ullum at village Dimatola Pt.I (Ph-I) SSM Other                 2,00,000.00                  1,50,000.00            50,000.00 On Going
      52 2016-17
      ( Ph - I )
      Protection measures against erosion by the river Brahmaputra at village Pampara Chatlarpar . (Ph-I) SSM Other                10,00,000.00                 7,50,000.00        2,50,000.00 On Going
      53 2016-17
      ( Ph - I )
      Const. of raised platform at Bondihana Iddgah Field. (Ph-I) SSM Other                  2,50,000.00                  1,87,500.00            62,500.00 On Going
      54 2016-17
      ( Ph - I )
      Int Fund
      Infrst. Development of play ground field near D.C.'s office Dhubri   DBB Other                 4,00,000.00                4,00,000.00                           -   Work Completed
      55 2016-17
      ( Ph - I )
      Const. of Boundar wall at Public High School Playground field Khopati MKR Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      56 2016-17
      ( Ph - I )
      Const. of Community Hall ( Char Model ) near Kaliralga MKR Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      57 2016-17
      ( Ph - I )
      Land Dev. at Diara Bazar MKR Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      58 2016-17
      ( Ph - I )
      Impv. of road from Siddik Ali Master House near PMGSY road to market MRA tyre House MKR Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      59 2016-17
      ( Ph - I )
      Infrastructure Dev. of Kutirghat Nabamilan ME Madrassa MKR Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      60 2016-17
      ( Ph - I )
      Infrastructure of Dev. of Wooden Bridge over kalo river Near Kalapani Outpost. MKR Other                  1,20,000.00                 1,20,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      61 2016-17
      ( Ph - II )
      Const. of Boundary wall of Raniganj Ancholik Kabarsthan Under BTAD BLP E Other                 3,92,000.00                3,92,000.00                           -   Work Completed
      62 2016-17
      ( Ph - II )
      Const. if Boundary Wall of Rangamati High School BLP E Other                 3,92,000.00                3,92,000.00                           -   Work Completed
      63 2016-17
      ( Ph - II )
      Const. of Boundary wall of Salkocha Bazar Kabarsthan under BTAD BLP E Other                 2,94,000.00                2,94,000.00                           -   Work Completed
      64 2016-17
      ( Ph - II )
      Const. of Culvert with approach from the house of Ramjan Ali to Mohammad Ali house BLP E Other                 3,92,000.00                2,94,000.00           98,000.00 On Going
      65 2016-17
      ( Ph - II )
      Const. of H.P. Culvert with approach near Abdul Azit house of Bangalipara Pt.II BLP W Other                 2,94,000.00                2,94,000.00                           -   Work Completed
      66 2016-17
      ( Ph - II )
      Const. of Class room of Ghunimari High School (Char Model ) BLP W Other                 3,92,000.00                2,94,000.00           98,000.00 On Going
      67 2016-17
      ( Ph - II )
      Const. of Class room Bagribari Junior College BLP W Other                 3,92,000.00                3,92,000.00                           -   Work Completed
      68 2016-17
      ( Ph - II )
      Const. of Boundary wall of 2058 No. Sarakpara L.P. School BLP W Other                 3,92,000.00                3,92,000.00                           -   Work Completed
      69 2016-17
      ( Ph - II )
      Const. of Boundary Wall of Kabarsthan at Village Tharigram vite SSM Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      70 2016-17
      ( Ph - II )
      Protection measures against erosion by the river Brahmaputra at village Dimatola - Katlamari area ( Ph-I ) SSM Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      71 2016-17
      ( Ph - II )
      Impv. of road from Abdul Hoque house to Anowar Hussain house with Sand Gravel GKG Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      72 2016-17
      ( Ph - II )
      Protection measures against erosion by the river Brahmaputra at Patakata Bazar area (Ph-I) SSM Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      73 2016-17
      ( Ph - II )
      Const. of Comunnity Hall at Chatlarpar Platform  SSM Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      74 2016-17
      ( Ph - II )
      Const. of Shed at Fakirganj Parghat Auto Stand SSM Other                  1,96,000.00                  1,47,000.00           49,000.00 On Going
      75 2016-17
      ( Ph - II )
      Const. of Boundary wall at Sialmari Kabarsthan SSM Other                 2,94,000.00                 2,20,500.00            73,500.00 On Going
      76 2016-17
      ( Ph - II )
      Const. of Sub-way road from Dr. Zakir Hussain road to Abdul Mozid house with C.C. block W/no.9 DBB Other                 2,94,000.00                 2,20,500.00            73,500.00 On Going
      77 2016-17
      ( Ph - II )
      Const. of RCC building with Land Dev. at the premises of Chest (T.B) Hospital, Dhubri (Ph-I) DBB SC & Gen               49,00,000.00              49,00,000.00                           -   Work Completed
      78 2016-17
      ( Ph - II )
      Impv. of Bata Gally road with C.C. Block W/No.7 DBB SC                 2,94,000.00                2,94,000.00                           -   Work Completed
      79 2016-17
      ( Ph - II )
      Const. of Community Hall at the premises of Batapara Pre-Senior Madrassa at Kaimari Pt. I GKG Other                 2,94,000.00                2,94,000.00                           -   Work Completed
      80 2016-17
      ( Ph - II )
      Const. of Boundary wall at Kutibari Iddgah field GKG Other                  1,96,000.00                  1,47,000.00           49,000.00 On Going
      81 2016-17
      ( Ph - II )
      Const. of RCC Culvert with approach at village Dumardaha near Soleman Ali House Gauripur Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      82 2016-17
      ( Ph - II )
      Const. of RCC Culvert with approach at Vill. Boraibari Pt. V Gauripur Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      83 2016-17
      ( Ph - II )
      Land Development with CC Block alongwith Toilet block both ladies & Gents at Hatsingimari Bus Stand MKR Other               33,32,000.00              33,32,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      84 2016-17
      ( Ph - II )
      Impv. of road from Agriculture road towards Railway line at village Dalaneralga Pt.II DBB Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      85 2016-17
      ( Ph - II )
      Const. of Science Laboratory Building at the premises of Goalpara College ( Ph-I ) Goalpara Other               49,00,000.00              49,00,000.00                           -   Fund transferred to D.C. Goalpara
      86 2016-17
      ( Ph - II )
      Const. of Class Room of Balaikhamar Hasong High School Goalpara ST                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      87 2016-17
      ( Ph - II )
      Const. of Wash Room with Running water supply facility at Sutarpara Bazar near madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      88 2016-17
      ( Ph - II )
      Const. of Community Hall at Aolatoli Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      89 2016-17
      ( Ph - II )
      Const. of Boundary Wall Chitlang LP School Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      90 2016-17
      ( Ph - II )
      Const. of Boundary Wall of Kamripara Kabarsthan - 1 Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      91 2016-17
      ( Ph - II )
      Const. of Community Toilet with water supply facility at Gugudoba near Madrassa. Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      92 2016-17
      ( Ph - II )
      Const. of Community Toilet at Moriomnagar near Jatiya Bidyalaya. Goalpara Other                  1,96,000.00                 1,96,000.00                           -   Fund transferred to D.C. Goalpara
      93 2016-17
      Int Fund
      Land Dev. at Daspara Shamshan Ghat, Asharikandi GAURIPUR SC                 2,00,000.00                2,00,000.00                           -   Work Completed
      94 2016-17
      Int Fund
      Impv. of road with CC Block near Patakata L.P. School Tiniali towards Zakir Hussain house SSM Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      95 2016-17
      ( Ph - II )
      CONTINGENCY         10,00,000.00    10,00,000.00               -   Work Completed

      List of schemes for the year 2017-2018

      Sl. No. Year  Schemes  Name of LAC Caterories 
      SC / ST /
      OTHERS
       Amt.
      Sanction 
        Amt. Released   Balance Amount  Remarks
      1 2017-18
      ( Ph - I )
      Const. of Community Toilet Block at Hashdoba near Madrassa Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      2 2017-18
      ( Ph - I )
      Const. of Entry Gate with Land Development of Moirakuchi Kabarsthan Goalpara Other                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      3 2017-18
      ( Ph - I )
      Installation of 60 Nos. HTW at Monkola Saildowa, Sundarpara &Beldubi GP area Goalpara Other                  7,50,000.00                 7,50,000.00                           -   Fund transferred to D.C. Goalpara
      4 2017-18
      ( Ph - I )
      Const. of Boundary wall of Bagun Police Station Goalpara SC                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      5 2017-18
      ( Ph - I )
      Installation of 40 Nos. HTW at Rowkhowa GP area Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      6 2017-18
      ( Ph - I )
      Installation of 40 Nos. HTW at Kalshabhanga GP area Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      7 2017-18
      ( Ph - I )
      Const. of Boundary Wall of Dwarka Gojapara High School Goalpara ST                 4,00,000.00                4,00,000.00                           -   Fund transferred to D.C. Goalpara
      8 2017-18
      ( Ph - I )
      Const. of Primara Village Road Goalpara ST                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      9 2017-18
      ( Ph - I )
      Const. of Conference Hall of Goalpara Press Club Goalpara Other                 6,00,000.00                6,00,000.00                           -   Fund transferred to D.C. Goalpara
      10 2017-18
      ( Ph - I )
      Const. of Patient Waiting Shed at 200 Baded Civil Hospital, Goalpara Goalpara ST                  3,50,000.00                 3,50,000.00                           -   Fund transferred to D.C. Goalpara
      11 2017-18
      ( Ph - I )
      Const. of Waiting Shed at lakhipur Circle Office Goalpara Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      12 2017-18
      ( Ph - I )
      Installation of 40 Nos. HTW at Ujirarchar, Darogaralga, Pakhiura & Basantapur NC Goalpara Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. Goalpara
      13 2017-18
      ( Ph - I )
      Const. of Toilet Block at Tiapara near Madrassa Goalpara Other                 3,00,000.00                3,00,000.00                           -   Fund transferred to D.C. Goalpara
      14 2017-18
      ( Ph - I )
      Const. of Boundary Wall at Uttar Kodal Dhowa Kabarsthan MKR Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      15 2017-18
      ( Ph - I )
      Const. of Boundary Wall at Manullapara Tiniali Anchalik Kabarsthan MKR Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      16 2017-18
      ( Ph - I )
      Land Dev. of Bangirchar Puran Sukchar Koumi Madrassa Play Ground MKR Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      17 2017-18
      ( Ph - I )
      Impv. of road from Jhagrarchar Ala Uddin house to Momin Uddin house at village Vati Jhagrarchar MKR Other                  5,00,000.00                 5,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      18 2017-18
      ( Ph - I )
      Const. of permanent stage at the premises of Jaruarchar Public High School SSM Other                  5,37,000.00                 5,37,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      19 2017-18
      ( Ph - I )
      Const. of Road from Anowar Hussain house to Sambhu Sen house of village Shernagar GKG Other                 6,00,000.00                6,00,000.00                           -   Work Completed
      20 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Tipkai of village Darbesherchar BLP E Other                 6,00,000.00                6,00,000.00                           -   Work Completed
      21 2017-18
      ( Ph - I )
      Impv. of road from Baniamari Pt. Viii to Sankosh at village Baniamari Pt. VIII BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      22 2017-18
      ( Ph - I )
      Const. of CC Block road from Arun Kumar Das house to Ranjit Basumatary house BLP E ST                 6,00,000.00                6,00,000.00                           -   Work Completed
      23 2017-18
      ( Ph - I )
      Const. of road with CC Block at village Morakura Gauripur SC                 6,00,000.00                6,00,000.00                           -   Work Completed
      24 2017-18
      ( Ph - I )
      Const. of road from Iswar Rabha house to Sujen Rabha house of village Murshuljhora with CC block GKG ST                  6,50,000.00                 6,50,000.00                           -   Work Completed
      25 2017-18
      ( Ph - I )
      Const. of road from Pathardubi Link road towards Murshuljhora Bazar with CC Block GKG ST                 6,00,000.00                6,00,000.00                           -   Work Completed
      26 2017-18
      ( Ph - I )
      Const. ofCommunity Hall ( Haj Bhawan) at 3 No. Balurchar near Iddgah Field DBB Other                10,00,000.00               10,00,000.00                           -   Work Completed
      27 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Gangadhar at village Satsewara GKG Other                  7,00,000.00                 7,00,000.00                           -   Work Completed
      28 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Brahmaputra of village Boaliarchar SSM Other                  7,00,000.00                 7,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      29 2017-18
      ( Ph - I )
      Const. of Community Hall at Nagabandh Bazar SSM Other                  4,50,000.00                 4,50,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      30 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Gourang of village Simlabari - Paroura area BLP E Other                  7,00,000.00                 7,00,000.00                           -   Work Completed
      31 2017-18
      ( Ph - I )
      Land dev. of Kazipara Kabarsthan BLP E Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      32 2017-18
      ( Ph - I )
      Const. of Community Hall at Radha Gobindo Hari Mandir Ashram at Bisondoi GKG SC                  3,50,000.00                 3,50,000.00                           -   Work Completed
      33 2017-18
      ( Ph - I )
      Const. of road from Dampur Road to Dampur Pt. I LP School Gauripur Other                  5,00,000.00                 5,00,000.00                           -   Work Completed
      34 2017-18
      ( Ph - I )
      Protection measure against erosion by the river Tipkai at village Chang Bandhakuti area BLP E Other                  4,50,000.00                 4,50,000.00                           -   Work Completed
      35 2017-18
      ( Ph - I )
      Const. of Community Hall ner Madinatul Ulum Madrassatul Bannat, Ghunimari BLP E Other                  3,50,000.00                 3,50,000.00                           -   Work Completed
      36 2017-18
      ( Ph - I )
      Const. of RCC Building at the premises of Harendra Narayan Seminary H.S. School at Bagribari BLP E SC                19,60,000.00               19,60,000.00                           -   Work Completed
      37 2017-18
      ( Ph - I )
      Const. of RCC Building at the premises of Ratnapith College BLP E ST                19,60,000.00               19,60,000.00                           -   Work Completed
      38 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Brahmaputra at village Dimatola Katlamari (Ph. II) SSM Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      39 2017-18
      ( Ph - I )
      Protection measures against erosion by the river Brahmaputra at Patakata Bazar area (Ph. II) SSM Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      40 2017-18
      ( Ph - I )
      Const. of Boundary Wall at Birsing Pt. I Kabarsthan SSM Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      41 2017-18
      ( Ph - I )
      Const. of Boundary Wall at Maajeralga Gurguripara Kabarsthan SSM Other                   1,47,000.00                  1,47,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      42 2017-18
      ( Ph - I )
      Const. of market shed at Bhelakuba Bazar SSM Other                  1,96,000.00                 1,96,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      43 2017-18
      ( Ph - I )
      Const. of Community Hall at the premises of Radha Gobinda Gita Satra of Kachuarkhas Pt. II Gauripur SC                  2,45,000.00                 2,45,000.00                           -   Work Completed
      44 2017-18
      ( Ph - I )
      Const. of Boundary Wall at Bhasani Aironjongla Iddagah field (Ph.I) DBB Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      45 2017-18
      ( Ph - I )
      Const. of Anti Water logging from Monsur Ali house towards Momor Uddin house at Subhash Nagar, W/No.12, Dhubri DBB SC                 6,86,000.00                6,86,000.00                           -   Work Completed
      46 2017-18
      ( Ph - I )
      Const. of road from PMGSY road to 222 No. South Dhubirchar L.P. School DBB Other                  5,39,000.00                 5,39,000.00                           -   Work Completed
      47 2017-18
      ( Ph - I )
      Const. of RCC building at the premises of Balajan H.S. School Gauripur Other                19,60,000.00               19,60,000.00                           -   Work Completed
      48 2017-18
      ( Ph - I )
      Const. of Facilitation Center at the premises of D.C's Office, Dhubri DBB Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      49 2017-18
      ( Ph - I )
      Const. of Community Hall at the premises of Fakirarchar L.P. School SSM Other                 2,00,000.00                2,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      50 2017-18
      ( Ph - I )
      Const. of RCC Building at the premises of Alomganj Rangamati College Gauripur Other                19,60,000.00               19,60,000.00                           -   Work Completed
      51 2017-18
      ( Ph - I )
      Const. of RCC Building at the premises of Pragati College, Agomani. Gauripur Other                19,60,000.00               19,60,000.00                           -   Work Completed
      52 2017-18
      ( Ph - I )     Int. Fund 
      Infrastructure Dev. & Lighting of Raja Probhat Chandra Baruah Play Ground and PWD Road, Dhubri DBB Other                 3,00,000.00                 2,25,000.00            75,000.00 On Going
      53 2017-18
      ( Ph - I )    Int. Fund 
      Infrastructure Dev. & Illumination of bye land of Dhubri including Circuit House & Gurudwara, Dhubri DBB Other                 2,00,000.00                  1,50,000.00            50,000.00 On Going
      54 2017-18
      ( Ph - II )
      Const. of Drainage from Nazirul Islam House to Abdus Samad House Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      55 2017-18
      ( Ph - II )
      Const. of Milannagar Santipur Village road from Ead Ali House to Nur Islam House Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      56 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Bhalukdubi Salbari Garo LP School Goalpara ST                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      57 2017-18
      ( Ph - II )
      Const. of Community Hall of Baleswary field at West Bhelakhamar Goalpara ST                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      58 2017-18
      ( Ph - II )
      Const. of Boundary Wall at Buduchar Public field near Budubuchar Madrassa Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      59 2017-18
      ( Ph - II )
      Const. of Community Hall at Kalairchar Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      60 2017-18
      ( Ph - II )
      Const. of Boundary Wall at Salmara Kabarasthan Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      61 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Pajabhanda LP School Goalpara SC                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      62 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Mohammadia Sr. Madrassa, Dekdowa Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      63 2017-18
      ( Ph - II )
      Const. of Community Hall at Kodaldowa near Kadaldowa LP School Goalpara Other                 3,92,000.00 392000.00                           -   Fund transferred to D.C. Goalpara
      64 2017-18
      ( Ph - II )
      Const. of Boundary Wall with gate of HMAH Madrassa, Porabhita Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      65 2017-18
      ( Ph - II )
      Const. of Gaurnagar Jr. College Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      66 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Dharai Kabarasthan Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      67 2017-18
      ( Ph - II )
      Const. of Boundary Wall with gate of South Chilarbhita LP School Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      68 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Karbala ME School Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      69 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Airkata Balupara Kabarasthan Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      70 2017-18
      ( Ph - II )
      Const. of Boundary Wall with bolder pitching at Khankai Madani Hafizia Madrassa Goalpara Other                 4,90,000.00 490000.00                           -   Fund transferred to D.C. Goalpara
      71 2017-18
      ( Ph - II )
      Const. of Building at the premises of Golakganj BPHC Hospital, Golakganj GKG SC & Gen                19,60,000.00               14,70,000.00        4,90,000.00 On Going
      72 2017-18
      ( Ph - II )
      Const. of Road from PWD Road Sindurai to Nisiyat Ali House via Samad Ali House at Vill. Sindurai GKG Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      73 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Gogharpar Aribic College ( Title Section), Sagolia GKG Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      74 2017-18
      ( Ph - II )
      Const. of Boundary Wall at Sankari Sanskrit Kristi Kendra Srimanta Sankardev Sangha at Simlabari GKG SC                  5,88,000.00                 5,88,000.00                           -   Work Completed
      75 2017-18
      ( Ph - II )
      Const. of Boundary Wall at Kuti Bhamundanga Idd-Gah-Field GKG Other                 2,94,000.00                2,94,000.00                           -   Work Completed
      76 2017-18
      ( Ph - II )
      Const. of Boundary Wall at Membertari Kabarsthan of Vill. Barundanga GKG Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      77 2017-18
      ( Ph - II )
      Const. of Boundary Wall of Jhaskal Pt.I kabarsthan GKG Other                 4,90,000.00                4,90,000.00                           -   Work Completed
      78 2017-18
      ( Ph - II )
      Impv. of road from Kataltuli  PMGSY Road to Kathaltuli High School of Vill. Kaimari GKG Other                     98,000.00                    98,000.00                           -   Work Completed
      79 2017-18
      ( Ph - II )
      Const. of Road from Irrigation Canel Road to Sabur Uddin House Gauripur Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      80 2017-18
      ( Ph - II )
      Const. of Boundary Wall at the premises of Arfatun Nessa ME Madrassa Gauripur Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      81 2017-18
      ( Ph - II )
      Const. of Market Shed at Kalapakani Bazar Gauripur Other                 9,80,000.00                 7,35,000.00        2,45,000.00 On Going
      82 2017-18
      ( Ph - II )
      Const. of Road from Hazari Gaon link Road towards Pachim Dhubri Kabarsthan DBB Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      83 2017-18
      ( Ph - II )
      Const. of Box Culvert with approach road from Ajoy Nath House towards Jayan Uddin Huse with sand gravel via Abdullah House DBB SC                19,60,000.00               14,70,000.00        4,90,000.00 On Going
      84 2017-18
      ( Ph - II )
      Const. of road from D.K. Road to Naranarayan Jr. College near Jhagararpar Stadium. DBB SC                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      85 2017-18
      ( Ph - II )
      Const. of Library room at the premises of Alomganj Rangamati College DBB Other               24,50,000.00                18,37,500.00         6,12,500.00 On Going
      86 2017-18
      ( Ph - II )
      Const. of RCC Building at the premises of Haji Musafirkhana, Hatsingimari ( South Salmara Dist.) SSM Other               49,00,000.00              49,00,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      87 2017-18 CONTINGENCY         10,00,000.00    10,00,000.00   Work Completed

      List of schemes for the year 2018-2019

      Sl. No. Year  Schemes  Name of LAC Caterories 
      SC / ST /
      OTHERS
       Amt.
      Sanction 
        Amt. Released   Balance Amount  Remarks
      1 2018-19
      ( Ph - I )
      Const. of Boundary Wall with Fate of Pub Kathuri High Madrassa Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      2 2018-19
      ( Ph - I )
      Const. of Drainage from Jaleswar Bazar Tiniali Forujulla House to Moinal House Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      3 2018-19
      ( Ph - I )
      Const. of Bolder piching from Jalal House to Khalek House Simlabari Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      4 2018-19
      ( Ph - I )
      Const. of Boundary Wall of Chatapara JB LP School Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      5 2018-19
      ( Ph - I )
      Const. of Bolder Pitching wall of South Bank Gara river Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      6 2018-19
      ( Ph - I )
      Const. of Boundary Wall of Palashbari Kabarsthan Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      7 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Markula PHC Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      8 2018-19
      ( Ph - I )
      Const. of Community Hall at Bashbari New Market Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      9 2018-19
      ( Ph - I )
      Const. of Cicle Stand at Ambari Bazar High School Goalpara Other                  2,45,000.00                 2,45,000.00                           -   Fund transferred to D.C. Goalpara
      10 2018-19
      ( Ph - I )
      Const. of Boundary Wall of Dosra Ambari ME School Goalpara Other                  2,45,000.00                 2,45,000.00                           -   Fund transferred to D.C. Goalpara
      11 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Nolonga Ujanpara LP School Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      12 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Bapurbhita Jurigaon LP School Goalpara Other                 2,94,000.00                2,94,000.00                           -   Fund transferred to D.C. Goalpara
      13 2018-19
      ( Ph - I )
      Const. of Community Hall at Lezam Goalpara Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. Goalpara
      14 2018-19
      ( Ph - I )
      Const. of Addl. Class Room at Hujuachar Pt. I Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      15 2018-19
      ( Ph - I )
      Const. of Waiting Shed at Balijana Circle Office Goalpara SC                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      16 2018-19
      ( Ph - I )
      Const. of Drainage at Moliapathar Bazar Rupnagar approach road Goalpara Other                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      17 2018-19
      ( Ph - I )
      Const. of Goalpara Civil Hospital Doctors' quarter approach road Goalpara ST                 4,90,000.00                4,90,000.00                           -   Fund transferred to D.C. Goalpara
      18 2018-19
      ( Ph - I )
      Const. of RCC Building & Land Development alongwith Boundary Wall at the premises of Barkanda Peoples Academy H.S. School DBB SC & Gen               49,00,000.00               36,75,000.00       12,25,000.00 On Going
      19 2018-19
      ( Ph - I )
      Const. of RCC Building & Land Development alongwith Boundary Wall at the premises of Bilasipara Sr. Madrassa BLP E Other               49,00,000.00               36,75,000.00       12,25,000.00 On Going
      20 2018-19
      ( Ph - I )
      Const. of Building at the premises of Balajan Higher Secondary School Gauripur SC & Gen               24,50,000.00                18,37,500.00         6,12,500.00 On Going
      21 2018-19
      ( Ph - I )
      Const. of Community Hall at Fakirganj Bazar area SSM Other                12,25,000.00                  9,18,750.00        3,06,250.00 On Going
      22 2018-19
      ( Ph - I )
      Const. of Addl. Class Room at the premises of Rowarpar Bhelakoba ME Maddrassa Birsing Jarua Other                 2,94,000.00                 2,20,500.00            73,500.00 On Going
      23 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Muthakhowa Iddgah field cum Platform Birsing Jarua Other                  4,41,000.00                 3,30,750.00          1,10,250.00 On Going
      24 2018-19
      ( Ph - I )
      Const. of raised Platform at Bondihana Iddgah field. Birsing Jarua Other                  2,45,000.00                  1,83,750.00             61,250.00 On Going
      25 2018-19
      ( Ph - I )
      Const. of Community Hall at the premises of Gurguripar Islamia ME Madrassa Birsing Jarua Other                 4,90,000.00                 3,67,500.00         1,22,500.00 On Going
      26 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Majeralga Jharnarchar Homuhia Kabarsthan Birsing Jarua Other                  2,45,000.00                  1,83,750.00             61,250.00 On Going
      27 2018-19
      ( Ph - I )
      Const. of Girls Common Room at Monirchar Reserve ME Madrassa Birsing Jarua Other                  1,22,000.00                     91,500.00            30,500.00 On Going
      28 2018-19
      ( Ph - I )
      Const. of Girls Common Room at Roshomari ME Madrassa Birsing Jarua Other                  1,22,000.00                     91,500.00            30,500.00 On Going
      29 2018-19
      ( Ph - I )
      Land Development at Uttar Kathulipara Kabarsthan Birsing Jarua Other                  2,45,000.00                  1,83,750.00             61,250.00 On Going
      30 2018-19
      ( Ph - I )
      Const. of Addl. Class Room at the premises of Birsing Maslabari ME Madrassa  Birsing Jarua Other                 2,46,000.00                  1,84,500.00             61,500.00 On Going
      31 2018-19
      ( Ph - I )
      Const. of Boundary Wall at Baladoba Dhanerkuti Kabarsthan MKR Other                 3,92,000.00                3,92,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      32 2018-19
      ( Ph - I )
      Impv. of road from Ali Hussain House to Amin Ali House at Vill. Tumni MKR Other                  2,45,000.00                 2,45,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      33 2018-19
      ( Ph - I )
      Infrastructure Dev. (i.e. Desk, Bench) etc. of Hazirhat High School MKR Other                     98,000.00                    98,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      34 2018-19
      ( Ph - I )
      Const. of Boundary Wall at the premises of South Salmara Jr. College MKR Other                 2,94,000.00                2,94,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      35 2018-19
      ( Ph - I )
      Land Dev. at Patakata Anchalik Kabarsthan MKR Other                  1,96,000.00                 1,96,000.00                           -   Fund transferred to D.C. South Salmara - Mankachar
      36 2018-19
      ( Ph - I )
      CONTINGENCY          5,00,000.00      5,00,000.00               -   Work Completed