Sl. No. | Year | Name of Scheme | Amount Recommended |
Amount Sanctioned |
1st Installment Released |
2nd Installment Released |
Balance Amount |
Remarks |
1 | 2016-17 | Installation of 187 nos. of HTW providing fresh drinking water facility under MLAADS for the year 2016-17 @Rs.5346/- per unit | 9,99,141.00 | 9,99,141.00 | 7,49,356.00 | 2,49,785.00 | - | Completed |
2 | 2016-17 | Construction Of foot bridge at Kadamtoli bazaar to Eiddgah field at Vill-Uttar Moragadadhar, Bacchurghat Saaser Shidik to Jabbar Ali House” under 25 Golakganj LAC | 66,500.00 | 66,500.00 | 49,875.00 | 16,625.00 | On Going | |
3 | 2016-17 | Construction of foot bridge at Chipul Sarkar house to Saratullah Ali house at Vill-Borocharaikhola, Tarani Roy house to Satyan Roy house at Vill-Purni, Pastarghat to GK Road at Bisondai” under 25 Golakganj LAC | 58,000.00 | 58,000.00 | 43,500.00 | 14,500.00 | - | Completed |
4 | 2016-17 | Construction of foot bridge at END bund to Adhir Roy house Taiband at Vill-Borocaraikhola, Godarghat to ME Madrassa near Mofizal Hoque house, Ganesher Dham to Rajen Rabidas house at Vill-Purni Pt-I, Sivmandir to Putul Roy House at Vill- Borocharaikhola under 25 Golakganj LAC | 65,000.00 | 65,000.00 | 48,750.00 | 16,250.00 | - | Completed |
5 | 2016-17 | Const. Of foot bridge over Raidak river Mahamaya dham at village Pabarchara | 54,595.00 | 54,595.00 | 40,947.00 | 13,648.00 | - | Completed |
6 | 2016-17 | Const. Of foot bridge over Bagrir dara near Ganesher dham at village Pokalagi Pt- IV, Bidyardabri Pt - IV near Rajen Ali house at Suman Ali house to Hafizur Mondal house at Sagolia Pt - I | 40,000.00 | 40,000.00 | 30,000.00 | 10,000.00 | - | Completed |
7 | 2016-17 | Imp. Of road from G.K.Road near Gopal oil mill towards Biswa Singha house at Kaldoba Pt - I | 90,000.00 | 90,000.00 | 67,500.00 | 22,500.00 | - | Completed |
8 | 2016-17 | Repair and renovation of road from NH - 31 to Sankardev Shishu Niketan at Kaldoba Pt - I | 90,000.00 | 90,000.00 | 67,500.00 | 22,500.00 | - | Completed |
9 | 2016-17 | Renovation of road from Kaldoba Satrasal PWD road near Parbati Saha house towards Amrit Adhikary house | 64,000.00 | 64,000.00 | 48,000.00 | 16,000.00 | - | Completed |
10 | 2016-17 | Spreading of sand gravel on road from Santosh Roy house to Mohibul Islam house at Sindurai Pt - I | 84,052.00 | 84,052.00 | 63,039.00 | 21,013.00 | - | Completed |
11 | 2016-17 | Spreading of sand gravel road form Bakul Ch. Das house to Nirmal Ch. Das house at Ramraikuti Pt -II | 45,105.00 | 45,105.00 | 33,829.00 | 11,276.00 | - | Completed |
12 | 2016-17 | Spreading of sand gravel road form Bikash Sen house to Dipak Roy house via Kuti - Kaldoba M.E.School | 93,947.00 | 93,947.00 | 70,461.00 | 23,486.00 | - | Completed |
13 | 2016-17 | Spreading of sand gravel road form Silghagiri bazaar to PMGSY road . | 93,947.00 | 93,947.00 | 70,461.00 | 23,486.00 | - | Completed |
14 | 2016-17 | Construction of boundary wall of public field near Brahmattar hari mandir under Biskhowa G.P | 1,70,000.00 | 1,70,000.00 | 1,27,500.00 | 42,500.00 | - | Completed |
15 | 2016-17 | Earth filling work of public field near Maa Manasa Mandir under Lakhimari G.P | 1,90,000.00 | 1,90,000.00 | 1,42,500.00 | 47,500.00 | - | Completed |
16 | 2016-17 | Earth filling work of public field near Jagadhatri Mandir under Harirhat G.P | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
17 | 2016-17 | Earth filling work of public field near Sarbajaninharimandir under Kachakhana G.P. | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
18 | 2016-17 | Construction of boundary wall of public field near Madan Mohan hari mandir under Kumarganj G.P | 2,20,000.00 | 2,20,000.00 | 1,65,000.00 | 55,000.00 | - | Completed |
19 | 2016-17 | Earth filling work of public field near Pagla babar mandir under Paglahat G.P | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
20 | 2016-17 | Construction of boundary wall & earth filling work of public field near Old kali mandir under Golakganj G.P. | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
21 | 2016-17 | Construction of boundary wall of public field near haji para jame masjid ( phase-1) under Bidyardabri G.P. | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
22 | 2016-17 | Earth filling work of public field near Baro Bot Tola hari mandir under Bidyardabri G.P | 80,000.00 | 80,000.00 | 60,000.00 | 20,000.00 | - | Completed |
23 | 2016-17 | Earth filling work of public field near Choto Bot Tola hari mandir under Bidyardabri G.P | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
24 | 2016-17 | Construction of boundary wall of public field near Amuker par Hari Mandir under Sindurai G.P | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
25 | 2016-17 | Construction of boundary wall of public field near Jugal Kisor Hari Mandir under Shernagar G.P | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
26 | 2016-17 | Construction of boundary wall of public field near Mahamaya mandir under Satrasal G.P | 2,40,000.00 | 2,40,000.00 | 1,80,000.00 | 60,000.00 | - | Completed |
27 | 2016-17 | Construction of boundary wall of public field near Raghunath kurer par hari mandir under Kaimari G.P. | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | - | Completed |
28 | 2016-17 | Construction of boundary wall of public field near Khudiram Club under Sagolia G.P | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
29 | 2016-17 | Eaarth Filling work of public field near Basakpara Mahaprobhur Dham under Bhamandanga G.P | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
30 | 2016-17 | Construction of CC Block road & earth filling from Bela rani roy House to N.H 31 under Shernagar G.P. | 4,00,000.00 | 4,00,000.00 | 3,00,000.00 | 1,00,000.00 | - | Completed |
31 | 2016-17 | Construction of boundary wall of public field near Sarbajanin Hari Mandir under Baterhat G.P | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | - | Completed |
32 | 2016-17 | Construction of CC Block road at Halakura H.S. School | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
33 | 2016-17 | Supply of furniture and fixtures at Baterhat High School under Boterhat GP | 50,000.00 | 50,000.00 | 37,500.00 | 12,500.00 | - | Completed |
34 | 2016-17 | Const. of boundary wall of public field near Kathaltali Idd Gah Under Koimari G.P. | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
35 | 2016-17 | Installation of 79 Nos. HTW providing fresh drinking water facility under Pokalagi G.P. | 7,03,100.00 | 7,03,100.00 | 5,27,325.00 | 1,75,775.00 | - | Completed |
36 | 2016-17 | Earth filling work of public field near Shree Shree Gurugobinda Mandir under Lakhimari G.P. ( PH I ) | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
37 | 2016-17 | Earth filling work of public field near Maa Manasa Mandir under Biskhowa G.P. | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
38 | 2016-17 | Earth filling work of public field near Harimandir at Biskhowa Pt - 5 , under Biskhowa G.P. | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
39 | 2016-17 | Earth filling work of public field near Protapganj Bazar Kali Mandir Under Barundanga G.P. | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
40 | 2016-17 | Supply of furniture and fixtures at Kachokhana H.S School under Kachokhana GP | 50,000.00 | 50,000.00 | 37,500.00 | 12,500.00 | - | Completed |
41 | 2016-17 | Const of CC Block road from NH 31 towards Agomoni CHC at Vill-Kaldoba Pt-I | 4,12,227.00 | 4,12,227.00 | 3,09,170.00 | 1,03,057.00 | - | Completed |
42 | 2016-17 | Spreading of sand gravel on roads at Vill- U. Moragadadhar from Mihiram Roy house to Subal Ch Roy house under Moragadadhar GP | 50,000.00 | 50,000.00 | 37,500.00 | 12,500.00 | - | Completed |
43 | 2016-17 | Land dev. Work near SC para Sarbajanin Kali Mandir under Harirhat GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
45 | 2016-17 | Earth filling and sand gravel work on the road at Borocharaikhola Vill from Ramesh Ch Roy house to Ramen Roy house under Harirhat GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
46 | 2016-17 | Construction of boundary wall at Ratiadaha HS School under Biskhowa GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | - | Completed |
47 | 2016-17 | Land dev work of public field near Lohajani Iddgah field under Boterhat GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
48 | 2016-17 | Impv. Of road from Ranpagli Panchayat towards Nagraj near West Bengal Border under Ranpagli GP | 50,000.00 | 50,000.00 | 37,500.00 | 12,500.00 | - | Completed |
49 | 2016-17 | Impv. Of road from Kaldoba Jame Masjid to Mini PHC at Vill-Kaldoba Pt-II under Shernagar GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
50 | 2016-17 | Impv. Of road from Nagendra Nath Roy house to Pradip Roy house via Ganga Mohan Roy house at Vill- Kaldoba Pt-III & Sonakhuli Pt-II | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
51 | 2016-17 | Impv. Of road from Afice Miah house to forest gate via Kalimandir & Faksa Ali house to Lakhikanta Roy house at vill-Sagolia Pt-i | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
52 | 2016-17 | Earth filling of play ground at Ranpagli MV School under Ranpagli GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
53 | 2016-17 | Impv. Of road from PWD road to Sanyashir Dham via Basak para at Vill-Jhapusabari Pt-I under Bhamondanga GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
54 | 2016-17 | Earth filling of Ranpagli Mini Sub-Centre under Ranpagli GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
55 | 2016-17 | Impv. Of road from D.K Road to Shimla Bari Ghat under Kumarganj GP | 70,000.00 | 70,000.00 | 52,500.00 | 17,500.00 | - | Completed |
56 | 2016-17 | Impv. Of road from Charaikhola Boro Masjid to Nowa Mir house under Bisondoi GP | 1,00,000.00 | 1,00,000.00 | 75,000.00 | 25,000.00 | - | Completed |
57 | 2016-17 | Impv. Of road from 1692 No Moragadadhar LP School to Moragadadhar GP Office via Hawyarghat under Moragadadhar GP | 70,000.00 | 70,000.00 | 52,500.00 | 17,500.00 | - | Completed |
58 | 2016-17 | Impv. Of road from Biskhowa Bazar to Biskhowa Pt-3 water supply under Biskhowa GP | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | - | Completed |
59 | 2016-17 | Impv. Of road from DK Road to Krishna Mohan Sen house under Barundanga GP | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | - | Completed |
60 | 2016-17 | Const. of community hall at Gharialdanga Pt-II Nabagothita Sakha Shiddha Yoga Ashram | 5,20,386.00 | 5,20,386.00 | 3,90,290.00 | 1,30,096.00 | On Going | |
61 | 2016-17 | Contingency Fund | 30000.00 | 30000.00 | 30,000.00 | - | Completed |
Sl. No. | Year | Name of Scheme | Amount Recommended | Amount Sanctioned | 1st Installment Released |
2nd Installment Released |
Balance Amount |
Remarks |
1 | 2017-18 | Const. Of Sashan Ghat brick boundary wall with grill with Chula near Sonahat Bazar under Kachakhana GP | 5,00,000.00 | 5,00,000.00 | 3,75,000.00 | 1,25,000.00 | On Going | |
2 | 2017-18 | Const. Of High quality bicycle stand at Petlagaon High Madrassa under Kumarganj GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
3 | 2017-18 | Const of Toilet with running water facilty near Banat Madrassa near Tiban under Bisondoi GP | 1,50,000.00 | 1,50,000.00 | 1,12,500.00 | 37,500.00 | On Going | |
4 | 2017-18 | Const. Of Sashan Ghat shed house with chula at Golakganj | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
5 | 2017-18 | Const of boundary wall near Shiv Mandir at Masulijhora Pt-II under Masulijhora VCDC | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
6 | 2017-18 | Const. Of boundary wall of Nabojyoti Club at Musaljhora Pt-I under under Musaljhora VCDC | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
7 | 2017-18 | Const of community hall at Burarpar under Barundanga GP | 2,50,000.00 | 2,50,000.00 | 1,87,500.00 | 62,500.00 | On Going | |
8 | 2017-18 | Const. Of boundary wall near Iddgah field at South Tokrechera Pt-I | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
9 | 2017-18 | Const of waiting shed at Kodomtoli Bazar under Harirhat GP | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
10 | 2017-18 | Const. Of boundary wall near Madhya Dafarpur Iddgah under Kachokhana GP | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
11 | 2017-18 | Boundary wall near Halghara (Huzuri) under Bisondoi GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
12 | 2017-18 | Community hall near Kumarganj Bazar Durga Mandir | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
13 | 2017-18 | Impv of open community hall at Sagolia Debibari | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
14 | 2017-18 | Const of boundary wall near Daribari Hari Mandir near Dipa Ray house at Sagolia Pt-II | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
15 | 2017-18 | Const of boundary wall near Jogodharti/Kali Mandir at Sagolia Churarpar Sagolia Pt-III | 2,50,000.00 | 2,50,000.00 | 1,87,500.00 | 62,500.00 | On Going | |
16 | 2017-18 | Const of boundary wall at Santipur Kabor Stan at Sagolia Pt-II | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
17 | 2017-18 | Impv of Nathmancha at Jinkata Rajahua Satra under Halakura GP | 3,56,895.00 | 3,56,895.00 | 2,67,671.00 | 89,224.00 | On Going | |
18 | 2017-18 | Const of boundary wall near Jorbari Radha Gabinda Hari Mandir | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
19 | 2017-18 | Const of boundary wall near Pachim Paborchara Jame Masjid | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
20 | 2017-18 | Const of boundary wall near Amzad Ali house Iddgah at vill-Jhapushabari Pt-II | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
21 | 2017-18 | Const of boundary wall of 1392 No Gajirkuti LP School at Sagolia Pt-II | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
22 | 2017-18 | Const of boundary wall near Bot Tola Kali Mandir at Ananda Nagar Sagolia Pt-II | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
23 | 2017-18 | Const of slab culvert near Pulu Barman house at Jhapushabari Pt-I | 5,00,000.00 | 5,00,000.00 | 3,75,000.00 | 1,25,000.00 | On Going | |
24 | 2017-18 | Const. of community hall near Sanyashirdham at Vill-Kaldoba under Shernagar GP | 10,00,000.00 | 10,00,000.00 | 7,50,000.00 | 2,50,000.00 | On Going | |
25 | 2017-18 | Const. of boundary wall near Radha Krishna Jugal Seva Ashram under Bidyardabri GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
26 | 2017-18 | Const. of community hall near Halakura College | 4,00,000.00 | 4,00,000.00 | 3,00,000.00 | 1,00,000.00 | On Going | |
27 | 2017-18 | Const. of boundary wall near Goalpara Kodomtola Mashjid under Sagolia GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
28 | 2017-18 | Extension of road from Barek Ali House to Mokbul Ali House at Sagolia GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
29 | 2017-18 | Const. of boundary wall near Sarkartari Mashjit at Vill- Lakkhimari Pt-III | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
30 | 2017-18 | Const. of HP culvert near Naushad Ali House under Barundanga GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
31 | 2017-18 | Earth filling works near Ekadoshi Mandir at Lakkhimari Bazar | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
32 | 2017-18 | Const. of boundary wall near Barmanpara Mandir under Golakganj GP | 2,50,000.00 | 2,50,000.00 | 1,87,500.00 | 62,500.00 | On Going | |
33 | 2017-18 | Const. of boundary wall near Cycle factory Kachokhana Mashjid under Kachokhana GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
34 | 2017-18 | Earth filling works near Sonahat BSF Camp under Bishkhowa GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
35 | 2017-18 | Earth filling works near Charer Bari Sanyashirdham under Bishkhowa GP | 2,50,000.00 | 2,50,000.00 | 1,87,500.00 | 62,500.00 | On Going | |
36 | 2017-18 | Const. of community hall near Boro Charaikhola Hari Mandir under Harirhat GP | 2,00,000.00 | 2,00,000.00 | 1,50,000.00 | 50,000.00 | On Going | |
37 | 2017-18 | Const of Waiting Shed at Chilarai College under Golakganj GP | 3,00,000.00 | 3,00,000.00 | 2,25,000.00 | 75,000.00 | On Going | |
38 | 2017-18 | Contingency Fund | 30000.00 | 30000.00 | 30,000.00 | - | Completed |
Sl. No. | Year | Name of Scheme | Amount Recommended | Amount Sanctioned | 1st Installment Released |
2nd Installment Released |
Balance Amount |
Remarks |
1 | 2018-19 | Providing solar street light near Satrasal Ramraikuti Satra under Satrasal GP | 5,00,000.00 | Under Process | ||||
2 | 2018-19 | Construction of CC Block Road from Pulu Barman house to Anil Ch Roy house under Bhamandanga GP | 6,50,000.00 | 6,50,000.00 | 4,87,500.00 | 1,62,500.00 | On Going | |
3 | 2018-19 | Construction of boundary wall near Dakhin Sagolia Simanta Hari Mandir under Sagolia GP | 3,00,000.00 | Under Process | ||||
4 | 2018-19 | Construction of CC Block Road Mahendra Karmakar House to Kankan Karmakar house under Barundanga GP | 3,50,000.00 | Under Process | ||||
5 | 2018-19 | Construction of CC Block Road from Kaluar House to Abul Ali House at Vill- Sagolia Pt-II | 4,50,000.00 | 4,50,000.00 | 3,37,500.00 | 1,12,500.00 | On Going | |
6 | 2018-19 | Construction of boundary wall of Agomani Girls ME School under Agomani GP | 3,00,000.00 | Under Process | ||||
7 | 2018-19 | Construction of CC Block Road from NH-31 to Halakura College under Halakura GP, Phase-II | 4,00,000.00 | Under Process | ||||
8 | 2018-19 | Contingency Fund | 30000.00 | 30000.00 | 30,000.00 | - | Completed |